Skip to content
Zeliox Australia & New Zealand

Modular Power That Scales With Your Operation

Power needs change. A tradie doing light electrical work today might take on larger jobs next year that need more capacity. Zeliox starts at 2.4 kWh and expands to 9.6 kWh — so you buy what you need now and add more later without replacing the system.

Fixed Capacity Locks You Into Today's Needs

Most dual battery and portable power systems are sized for a single use case. If your power needs grow — more tools, longer shifts, new equipment — you are either running a generator as backup or buying an entirely new system. Neither is cheap.

Fixed Capacity
One-size purchase
Upgrade Cost
Full system replacement
Generator Backup
Defeats the purpose
Unknown Future
Hard to forecast needs
Overbuy Risk
Paying for unused capacity

Start Small, Add Expansion Units Later

Zeliox systems are modular. Start with the base unit at 2.4 kWh. When your needs grow, add Zeliox expansion packs to reach up to 9.6 kWh — all managed as one system through the same monitoring interface and installation footprint.

  • Base Capacity: 2.4 kWh
  • Max Capacity: 9.6 kWh
  • Expansion Packs: Modular add-ons
  • Same Footprint: Compact integration
  • Unified Monitoring: One app
  • Future-Ready: Scale as needed

Buy for today. Expand for tomorrow.

Before & After Zeliox

Before Zeliox

After Zeliox

Buy capacity you might not need
Start with base capacity, add later
Outgrow your power in 12 months
Snap in expansion packs when needed
Generator fills the capacity gap
Battery capacity scales with the job
Replace the whole system to upgrade
Add modules to the existing unit
Guess what capacity you will need
Grow capacity as your work grows

Frequently asked questions

How do expansion packs connect?

Zeliox expansion packs connect to the base unit and are managed as one system through the same monitoring app and charge controller.

Can I add expansion packs later or do I need to buy them upfront?

You can add expansion packs at any time. Start with the capacity you need now and add more as your power requirements grow.

Start with what you need to power

Tell us what needs to run and for how long. We will help you work through the options.